HST and BST Lab Renovations

Department
Campus Planning, Design, & Construction (CPDC)
Overview
This multiphase project is modernizing research laboratories within Stony Brook University's Health Sciences Tower (HST) and Basic Science Tower (BST). The renovations will transform existing, enclosed laboratory spaces into modern, open-plan environments designed to accommodate evolving biomedical research needs, including molecular biology and biochemistry.
Construction is being completed in phases to minimize disruption to ongoing research activities.
Key Highlights
- Renovation of six laboratory quadrants across HST and BST, providing flexible, open-plan research environments.
- Completion of the first laboratory quadrant on Level 6 of BST in May 2026.
- Design underway for two additional BST laboratories on Levels 6 and 7, including dedicated space for pharmacology research.
- Planning underway for a Level 9 pathology laboratory and two additional laboratory quadrants.
Impact
The renovations will replace aging laboratory infrastructure with modern, adaptable research environments that support collaboration and evolving scientific needs across the Renaissance School of Medicine, including the departments of Physiology, Pharmacology and Pathology.
By improving the functionality and flexibility of existing research space, the project will strengthen Stony Brook's capacity to advance biomedical discovery, attract and retain leading research faculty and pursue competitive external research funding.
Anticipated Completion Fall 2030
Project Contacts
Erika Murray - Director of Planning, Design, Construction Health Sciences - erika.murray@stonybrook.edu